Caravelle's autumn season started in the beginning of September

Keskiviikko 6.9.2023 - Ismo Matinlauri

Suomeksi

The restoration work of the Caravelle OH-LEA at Turku airport started efficiently on Monday, September 4th, when there were nine volunteers at work. In the Turku area it rained a lot in August, and it wasn’t possible to do any of the remaining restoration work outside the aircraft. During the summer weekends the Caravelle was open to visitors, and this led to some restrictions to starting the work inside the aircraft.

Cblogi_2023-82-00.jpg

On the last weekend we had the summer season’s last open doors event and after this it was possible to continue the restoration work from where we had left it in June. The half cloudy weather was ideal for sanding, polishing, and painting the last identification markings.

Cblogi_2023-82-03-04.jpg

Cblogi_2023-82-05-06.jpg

Cblogi_2023-82-07-08.jpg

On the underside of the fuselage there is a small area which needs to be sanded and painted with aluminium colour paint. The last identification markings will be painted on the wings and fuselage. The largest of these is the registration OH-LEA missing on the underside of the wing.

Cblogi_2023-82-01-02.jpg

Photos by Lassi Karivalo.

A lot of polishing work is still needed, this is the main item to be completed on the outer surface. Polishing will be continued as long as the weather allows. However, there is so much to be polished that the work will continue next spring.

Cblogi_2023-82-09.jpg

The work inside the aircraft has also started. The repairs and painting of the flight deck and the toilet area will be the first work items. The floor and the ceiling area in the cabin will follow in the coming weeks.

Cblogi_2023-82-10.jpg

It was a pleasure to have visitors from the Tuesday Club at Vantaa. Three club members came to Turku to measure the openings on the tail of the DO-5, which is temporarily parked next to the Caravelle. Protecting covers will be made at the Tuesday Club to cover the holes before the autumn storms arrive.

Cblogi_2023-82-11.jpg

The busy afternoon was spent at work, but there was a moment for lively discussion when the Turku team and the Tuesday Club members had a coffee break together inside the aircraft at “Café Caravelle”. The Tuesday Club is a valuable support and aid for the Turku team when the details of the restoration work are pondered. We are looking forward to making good progress during the autumn.

Photos by Jouko Tarponen except if otherwise mentioned.

Translation by Erja Reinikainen.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird, Tuesday Club

Tuesday Club's autumn season 2023 under way

Keskiviikko 30.8.2023 - Tuesday Club member

Suomeksi

Tuesday Club members returned from their summer break “back to the lathe” on August 22nd. However, once again it must be noticed that the group working on the VL Myrsky II (MY-14) had the stamina to work with the Myrsky through the summer. As a result of their effort the Myrsky wing is now united with the MY-5 fuselage frame, which we have as a testing fuselage. Thanks to this the wing/fuselage joint covering fairings could be test-fitted.

Blogi_2023-24-01.jpg

Along with the Myrsky restoration project, the main project of autumn 2023 is to continue the restoration of Valmet Tuuli III (TL-1), which has been on hold for a number of years. In this project, led by the Finnish Aviation Museum, we’ll be concentrating on the aircraft’s fuselage, whose outer exterior surface we had started to polish clean and shiny already in the autumn season of 2022.

Blogi_2023-24-02.jpg

In 2015 and 2016 nearly all parts of the Tuuli II had been dismantled for restoration purposes, including the cockpit instruments and gadgets. For the most part they had also been cleaned. In 2018 these parts were packed in case the Finnish Aviation Museum would have moved at that time to a cargo terminal freed by Finnair. However, that didn’t happen and now we continue in a way from where we were left then.

Blogi_2023-24-03.jpg

First we’ll concentrate on the thorough cleaning of the Tuuli cockpit, which was nearly emptied. The cockpit’s inner surfaces and structures will be washed clean, possibly partly with a pressure washer. Simultaneously we’ll start to go through the parts packed in 2018 and cleaning them where cleaning will be necessary. The long-term aim of our work is to assemble the Tuuli for display. It will, however, take a few years before that will happen.

Blogi_2023-24-04.jpg

Blogi_2023-24-05.jpg

Blogi_2023-24-06.jpg

The horizontal stabilizer of the 1920’s Caudron C.59 advanced trainer was refurbished and was fully ready to be covered with fabric already a couple of years ago. Now we’ll start to cover the stabilizer with cotton fabric. However, first we’ll test its tightening properties. For that reason we built a wooden frame, onto which we attached a piece of the acquired fabric. We already made a water tightening test on the fabric by spraying it with water. We will test with lacquer by starting with thinned nitro cellulose lacquer ending up with pure lacquer. The patched lower wings of the Caudron took too much space, so they were moved from the restoration workshop to the I-hall of the Finnish Aviation Museum, to wait for the next work phase.

Blogi_2023-24-07_JS.jpg

Photo by Janne Salonen.

We will carry on with work on the C-47 (DO-5) fuselage, Caravelle III (OH-LEA “Bluebird”) and MiG 21 BIS (MG-111) cockpit. Aviation Museum Society’s owned DO-5 and OH-LEA are presently on show in the vicinity of the Turku Airport Terminal, but the cockpit of the MG-111, which will be turned into a cockpit simulator, is at the Finnish Aviation Museum. On top of that, we ‘ll cover the derelict tail boom stabilizers of the Mil Mi-8 (HS-4), situated at the Karelian Aviation Museum.

Blogi_2023-24-08.jpg

Blogi_2023-24-09.jpg

Of the jobs assigned to the Tuesday Club to refurbish the Caravelle, the repairing of the right-hand wing tip, including the making of the navigation light frames, is still unfinished. There’s also been talk about refurbishing the pilots’ seats into functioning condition at the Tuesday Club. This would necessitate bringing the seats from Turku to Vantaa. Also the making of protective sheaths of fabric or leather for the pitot tubes beneath the nose would be on offer for us.

Blogi_2023-24-10_IM.jpg

Photo by Ismo Matinlauri.

Blogi_2023-24-11.jpg

During the spring season we worked hard to get the C-47 (DO-5) fuselage, which had been used for training paratroopers for the Defence Forces, ready to be on show at the Turku airshow. Time ran out for us then to do all we planned, and we are going to catch up now with the work, even though the fuselage is in Turku. The most important item on the list will be the making of protective covers for the openings for the horizontal-and vertical stabilizers, to prevent rain water getting into the fuselage. The stabilizers naturally aren’t attached to the fuselage now.

We are also making a lookalike copy of the glide path antenna, which is a part of the ILS (instrument landing system) in the nose of the DO-5. For that we have an original antenna as a model and the stem of a broken antenna.

Blogi_2023-24-12.jpg

Blogi_2023-24-13.jpg

Blogi_2023-24-14.jpg

During last year’s autumn season and the spring season we managed empty the MiG 21 BIS cockpit for it to be transformed into a MiG 21 BIS cockpit simulator. This cockpit section was received by Aviation Museum Society when the aircraft was scrapped by
breaking it to pieces at the Aviation Museum’s yard. A few BIS- jobs were left undone from the spring, like the opening in the rear bulkhead of the cockpit for a fresh air blower, removing a few brackets from the front part of the cockpit and making of the floorboard in the front part. The jobs have already been commenced.

Photos by Lassi Karivalo except if otherwise mentioned.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, Tuesday Club

Time to test-fit the Myrsky oil cooler

Lauantai 19.8.2023 - Tuesday Club member

In Finnish

Parallel with the fitting of the wing root fairings, the test-fitting of the barrel-shaped oil cooler was commenced. The Myrsky oil cooler is situated in the fuselage centre line, attached to the main spar “forehead”. Air comes to the oil cooler through an air duct from the left-hand wing’s leading edge. Respectively, after going through the oil cooler the air exits from the underside of the right-hand wing.

For the MY-14 fighter restoration we have at our disposal an original Pratt & Whitney R-1830 Twin Wasp engine’s oil cooler, the very engine that powered the Myrsky. We received it from Airveteran Oy. Instead we have had to manufacture all the accessories for the oil cooler, including the ducts for the supply and exhaust air and the dampers adjusting airflow.

The air ducts were made of 1mm thick, easily workable aluminium sheet. The pieces cut off the sheet were shaped in wooden shaping lasts, after which the seams were welded. We also made the dampers or gills that adjust the amount of air going through the oil cooler. The dampers adjusting the amount of supply air are controlled mechanically from the cockpit.

Blogi_2023-23-01_HK.jpg

Blogi_2023-23-02_HK.jpg

Blogi_2023-23-03_HK.jpg

Photos by Heikki Kaakinen.

Normally the oil cooler is permanently attached to the main spar. Because the MY-14 wing is made of two halves and the oil cooler is situated at the junction, the oil cooler must always come off, when and if the Myrsky will be dismantled for transportation to another museum or some other place to be placed on display. That’s why a handy rack with attachment straps was constructed. The oil cooler will be strapped on it and the rack is easily detachable from the wing spar and can also easily be reattached.

Blogi_2023-23-04_HK.jpg

Blogi_2023-23-05_HK.jpg

Photos by Heikki Kaakinen

The test-fitting of the oil cooler was started by attaching the oil cooler attachment rack on the junction of the wing halves. The oil cooler was tightened to the straps. After that the cooler’s right-hand cooling air exhaust duct was fitted into place. The duct opens to the underside of the right-hand wing’s leading edge.

Blogi_2023-23-06.jpg

Blogi_2023-23-07_HK.jpg

Photo by Heikki Kaakinen

Blogi_2023-23-08.jpg

The gills adjusting the incoming airflow were attached to the other end of the oil cooler. The gills are situated between the oil cooler and the supply air duct. The duct for incoming air is twofold. One end of the duct’s straight part is attached to the supply air damper and the other end to the front end of the L-shaped supply air duct. The opening of the incoming air duct is situated in the right-hand wing’s leading edge. There’s still work to do in fitting the oil cooler parts before every part is settled in its place as planned. A veritable “collection of gadgets” this Myrsky oil cooler system has proved to be.

Blogi_2023-23-09.jpg

Blogi_2023-23-10.jpg

The pitot-tube, which measures the airspeed of the aircraft and is situated on the left-hand wing, was also test-fitted. The pitot-tube rack has been in place for long in the left-hand wing’s leading edge. We noticed, to our chagrin, that the 300 mm pitot-tube at our disposal was of a wrong length. It should be of the 500 mm long type. This can be seen in the Myrsky blueprints and photos taken of the Myrsky. Might there be a pitot-tube of the right length for us in the collections of the Finnish Air Force Museum?

Blogi_2023-23-11.jpg

Along with all other tasks numerous inspection hatches on the wings are being fitted into place. We had to grind the collars of the hatches a bit deeper, so that the hatches would become flush with the wing surface.

Photos by Lassi Karivalo except if otherwise mentioned.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, MY-14, VL Myrsky, Tuesday Club

Caravelle visitors are welcome

Tiistai 4.7.2023 - Ismo Matinlauri

Suomeksi

The Caravelle restoration team went on a well-earned summer holiday after the Turku Airshow. The restoration work is not finished outside or inside, and the team will continue its work in August. However, the unfinished appearance isn’t an obstacle for presenting the aircraft to the interested audience. The nearly 1300 visitors during the Airshow days proved this to be true.

Blogi_2023-72-01.jpg

Last week I had the pleasure of presenting the Caravelle to a group of motor bikers consisting of Hornet-men mainly from the Defence Forces, Insta, Finnair and Patria. This was a group of experts and the first hour or so was spent outside the aircraft discussing the wing construction and engines. The Caravelle’s history and similarities to the Comet, especially in the flight deck, were discussed, too.

Blogi_2023-72-02.jpg

The visit to the cabin and flight deck was brief, mainly due to the temperature resembling a sauna. There the visitors concentrated on the differences in the passenger cabins of modern and 1960s aircraft. The seat frames in the rear cabin caught the visitors’ attention as they are not from a Caravelle III.

Blogi_2023-72-03-04.jpg

I thank the visitors for their interest in our project – and take the opportunity to welcome more visitors to come and see the Caravelle. English-speaking vistors are welcome, too! At the moment we don’t have regular visiting times, but we try to be flexible in arranging someone to come and give a tour. Feel free to contact me about a visit, preferably well in advance, so that we can arrange a tour for you.

Contact berfore visiting: Ismo Matinlauri, +358405013495, matinlaurii(at)gmail.com

Photos by Ismo Matinlauri.

Translation by Erja Reinikainen.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

The DO-5 fuselage on display at the Turku Airshow

Perjantai 23.6.2023 - Tuesday Club member

The fuselage of the Douglas C-47 A, registered DO-5, owned by Aviation Museum Society Finland was on display at the Turku Airshow as part the Aviation Museum’s stand. The DO-5 fuselage, which was used by the Finnish Air Force for training paratroopers in the 1960’s, was refurbished enough in the Aviation Museum Society’s Tuesday Club for the fuselage to be brought on display to Turku. The Airshow visitors could be allowed inside the fuselage to see how the aircraft was used in training the paratroopers.

Blogi_2023-17-01_JS.jpg

Blogi_2023-17-02_JS.jpg

Blogi_2023-17-03_JS.jpg

Photos by Janne Salonen

Blogi_2023-17-04_LK.jpg

Photo my Lassi Karivalo

The DO-5 fuselage was transported from the Aviation Museum’s yard at Vantaa to Turku Airport on the Thursday before the Airshow weekend. The Aviation Museum Society’s stand was situated in the Airshow area close to the mighty Boeing C-17 Globemaster. So there they were in close vicinity, the USA Air Force Air Transport aircraft from the 1930’s and the 1990’s, albeit in different calibre.  

Blogi_2023-17-05_LK.jpg

Blogi_2023-17-06_LK.jpg

Blogi_2023-17-07_LK.jpg

Photos by Lassi Karivalo

The Society had also brought on display the “Snoopy” aircraft donated to the Society and awaiting full restoration. This experimental aircraft from 1969 was constructed by the brothers Ari and Esko Hietanen from Turku.

Blogi_2023-17-08_JP.jpg

Photo by Janne Pauni

The DO-5 fuselage drew great interest among the Airshow visitors. On both show days, Saturday and Sunday, people poured into the DO-5 to hear about the history of this individual aircraft and about the refurbishing projects done by the Tuesday Club, including the full-sized photo in the cockpit of the instrument panel of the Kar-Air DC-3 OH-VKB, which is situated in the Aviation Museum.

Blogi_2023-17-09_JV.jpg

Photo by Juha Veijalainen

Blogi_2023-17-10_JK.jpg

Photo via Jarmo Kaipainen

We told the visitors in particular how the DO-5 was used at Utti as a jump aircraft to train paratroopers and after it was taken off from flying, how the fuselage was utilized on the ground as a dry run platform before the first real jump as a paratrooper. We didn’t keep count how many persons visited the interior of the DO-5, but we estimate that the number is nearer 2000 than one thousand. It was a pleasant incident, when someone visited the aircraft and said that he had jumped from this very aircraft in 1963 on his conscript time, when it still served as a jump aircraft.

Those who visited the aircraft were also very interested in the Aviation Museum Society’s DO-5 project in itself. They thought it was commendable that Aviation Museum Society Finland saved from the scrap yard an aircraft used by the Air Force in the 1960’s, with the cabin still in its original paratrooper training attire. Our project isn’t solely to preserve a C-47 because there are plenty of them still flying in the world, including converted airliner flying “Dak”, the OH-LCH, owned by Airveteran Oy.

In preserving the DO-5 we’ll be able to save for the future generations Air Force history from the 1960’s concerning paratrooper training. We at the Tuesday Club can be proud as Punch for what we have already done to refurbish the fuselage. Without our input the fuselage wouldn’t have been in such a condition that it could have been put on display. There’s still a lot to do with the DO-5, but time will show how far we can go. The positive feedback we received at the Turku Airshow only confirmed how important our idea was, from the point of aviation history, to save the DO-5 used by the Air Force in training paratroopers more than 50 years ago.

We, inside the DO-5 telling the visitors about the history and use of the aircraft, were literally in a hot spot. The scorching weather and the sun blaring from a cloudless sky heated the interior really hot. The temperature must have been nearly +50 degrees Celsius, even though we had installed a few fans to ease our existence. We did survive the hours’ long “sauna” of both airshow days. It must be admitted that cases of mineral water and Coke relieved the situation in preventing dehydration.

The positive attitude of the visitors motivates Aviation Museum Society Finland to carry on with the refurbishing of the DO-5. From the point of view of the Tuesday Club the situation is problematic, because for the time being the DO-5 remains in Turku and our club operates in the Finnish Aviation Museum’s premises in Vantaa in co-operation with the Museum.

Blogi_2023-17-11_JS.jpg

Blogi_2023-17-12_JS.jpg

Blogi_2023-17-13_JS.jpg

Photos by Janne Salonen

After the Airshow the DO-5 fuselage was transported to Turku Airport to the vicinity of the Caravelle III, which was restored as Finnair’s “Bluebird”, and is owned by Aviation Museum Society Finland. There the Old Lady DO-5 can stay by the little younger Old Lady the “Bluebird” on public display.

Blogi_2023-17-14_JS.jpg

Blogi_2023-17-15_JS.jpg

Photos by Janne Salonen

The former SAS Caravelle (SE-DAF) presently in Finnair colours, outside the actual Airshow area also interested the Airshow visitors very much. So about 1300 people popped in to get acquainted with the Caravelle “Bluebird” on their way from the Airport terminal bus-stop to the gates of the Airshow area. It was well worth getting acquainted with, because the newly painted Finnair “Bluebird is a truly resplendent sight.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, Tuesday Club, C-47, DC-3, DO-5

Thank you to the supporters of the Caravelle project

Keskiviikko 21.6.2023 - Erja Reinikainen

We managed to restore the SAS Caravelle III Sven Viking, abandoned on the edge of the airfield for decades, to the Finnair OH-LEA Bluebird in the schedule we had defined. It was open to the public during the Turku Airshow at Turku airport, on June 17th and 18th. On both days there was a queue at the Bluebird’s gate and the volunteer guides, who have been involved in the restoration work, had an interested audience. After a successful effort – the restoration and the airshow weekend – the team of volunteers can relax and enjoy a well-earned summer holiday.

Cblogi_2023-70-01_JT.jpg

Cblogi_2023-70-02_JT.jpg

Photos by Jouko Tarponen

We think that this is a good moment to thank all those who have supported the Caravelle project. Without you the Bluebird wouldn’t be ready to be presented to the public.

In this period of about a year and a half we have received financial support for the procurement of many important items. In a society operating on membership fees we appreciate your support very much. Many of you have lent us special tools which are needed in the disassembly and reassembly work. Without your help we wouldn’t have been able to get these tools. Furthermore, we have been given access to Caravelle archive data, we have been given lots of valuable advice and all kinds of help in the problems we have encountered during the project.  

We thank the companies and societies which have supported us. They are mentioned at the end of this blog.

We thank all the private persons who have helped us in various ways during the project.

And last but not least, we thank the family members and other close ones of our volunteers for patience and understanding for the OH-LEA Bluebird.

Caravelle-project supporters:

Statens Maritima on Transporthistoriska Museer (Sweden)

  • Sud Aviation SE 210 Caravelle III SE-DAF "Sven Viking" aircraft.

Arlanda Flygsamlingar (Sweden) / Jan Forsgren

  • Assistance in matters related to Caravelle aircraft.

Le Caravelle Club (Sweden) / Ulf Nyström

  • Assistance in matters related to disassembling and reassembling the Caravelle, and tools lent for assembly work.  

Swedavia (Sweden) / Andreas Persson

  • Assistance in matters related to moving and disassembling the Caravelle.

Danmarks Tekniske Museet, Helsingør (Denmark) / Susanne Krogh Jensen

  • Assistance and archive material in matters related to disassembling and reassembling the Caravelle,.

Ahola Special

  • Assistance and consulting in planning the Caravelle transportation.
  • Special thanks to the drivers for helping in loading and unloading the aircraft parts.

Finnlines

  • Trasportation of four special trucks on the ferry from Kapellskär to Naantali and turning the ferry around in Naantali.

Rantala-yhtiöt

  • Assistance and consulting in planning the lifting operations during the assembly phase.
  • Special thanks to the crane operators during the assembly.

P. Tyllilä Linja Oy / Juhani Tyllilä, Katri Tyllilä, Kimmo Koskinen

  • Travel and accommodation arrangements in Finland and abroad.

Select Service Partner Finland Oy

  • Lunches at Turku airport for the volunteers working on the Caravelle site.

Kuljetus R. Stenvall Oy / Jussi Mäkelä

  • Sea container logistics and support in planning the transportation, contact information for Finland and Sweden.

Nostot & kuljetukset R. M. Laine Oy / Mikko Laine

  • Transportation and lifting of sea containers, passenger stairs, etc. in Turku area.

Toolpoint

  • Hydraulic pump and cylinder for the disassembly and reassembly work.

Hyvinkään Ilmailukerho ry

  • Cradles and supporters lent for the disassembly and reassembly.

Finnair Tekniikka

  • Tools lent for disassembly and reassembly.

Granlund

  • Work safety material for the disassembly team.

Finavia / Juha Aaltonen, Veli-Matti Paasikivi, EFTU kunnossapito

  • The site for the Caravelle at Turku airport and other assistance in the project.
  • Earth moving works on the Caravelle site and wheel loader to help during the preparations of the assembly phase.

Canon

  • Colour prints of the OH-LEA painting by Kari Vertanen for a fund-raising campaign.

Port of Turku

  • Assistance in bringing the Caravelle to be restored in the Pansio port hall.

RMR Merirakenne

  • Assistance and material for building the free-turning pulley system for rotating the aircraft.

Companies in the Pansio shipyard area

  • Assistance in moving and lifting the aircraft and tools lent for the assembly work.

Teknos / Markku Uusitalo

  • Paint for the restoration work.

Anzo / Oy C.E. Lindgren Ab

  • Paint brushes for the restoration work.

Jalmeri

  • Mohair paint rolls for the restoration work.

Arctic Decals / Mika Jernfors

  • Assistance in acquiring the stencil stickers and in sorting out the details for the painting work.

Peter Lampinen

  • 3D-printing of the navigation light covers

Ronema

  • Instruments for the Caravelle’s flight deck.

Consolis Parma

  • Three hollow core slabs to be placed under the Caravelle’s landing gear at Turku airport.

NCC

  • Gravel for building the other driveway to the Caravelle site.

Ossi Harjula

  • Construction contracting services for the Caravelle site works.

Finnish Aviation Museum

  • Support in acquiring information, permission to use premises and equipment for doing Caravelle restoration work, tools lent for disassembly and reassembly.

The Media

  • Articles and video material about the project in various phases.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Tuesday Club's DO-5 work completed

Keskiviikko 21.6.2023 - Tuesday Club member

The hard work of the Tuesday Club members was instrumental in getting the fuselage of the type C-47A DO-5, owned by Aviation Museum Society Finland, into sufficient shape for putting it ready for showing before the Turku Airshow. It was touch and go because the last tasks weren’t finished until two days before the fuselage of DO-5 was transported from the yard of the Finnish Aviation Museum to Turku Airport on June 15th, 2023.

The last significant project was to install new plexiglass panes for the cockpit. The Air Force DO-5 hasn’t had original panes in the cockpit for decades. Part of the windows lacked panes altogether, resulting rainwater and snowstorms ruining the cockpit badly, whilst the fuselage lay forgotten for decades in the Utti forests.

Because the original cockpit panes and the large sliding panes on both sides of the cockpit weren’t available, we ended up with acquiring plexiglass panes for the window openings. On top of that we decided to attach the plexiglass panes to their frames with a mixture of glue and sealant mass. In this way the windows become watertight, preventing water to seep into the fuselage. This also meant that the big sliding panes on both sides of the DO-5 cockpit couldn’t be slid open anymore.

Blogi_2023-16-01.jpg

Blogi_2023-16-02.jpg

Blogi_2023-16-03-04.jpg

To acquire new 5mm polycarbonate plexiglass panes we made a template out of thin plywood for each of the window openings. For the windscreens we had already in the autumn acquired from ETRA plexiglass panes ready cut to form. Cold weather and the oncoming winter, however, put paid to carrying on with the installing of the windowpanes. We fastened then the plexiglass panes and the temporary panes in the other windows with plastic tape from their edges to wait for the warmer temperatures of the spring, when we could continue with the cockpit windows.

Blogi_2023-16-05-06.jpg

Photos by Lauri Veijalainen

Blogi_2023-16-07-08.jpg

Other tasks to refurbish the DO-5 fuselage in the spring delayed attaching the new plexiglass panes, so that we didn’t get to it until May 2023. Then the plexiglass panes for the large sliding windows on the sides of the cockpit were acquired.

Blogi_2023-16-09.jpg

Blogi_2023-16-10.jpg

Photos by Lauri Veijalainen

Blogi_2023-16-11.jpg

Each plexiglass pane was squeezed into its frame and a thin rubber strip was installed under the lower edge of the pane in order to get the pane at the right elevation in its groove. After that the edges of the panes were taped either by masking tape or with plastic tape so that there remained a suitable zone for the glue and sealant mass. The tape is to protect the rest of the surface of the pane from the sealant mass to spread and that the seam of the sealant mass will be clean.

Blogi_2023-16-12.jpg

Photo by Lauri Veijalainen

After the taping, the glue and sealant mass was squeezed out along the seam of the pane and the frame. After that the mass was formed even with a plastic forming spatula. As mass we used black Soudaseal and Würth glue and sealant mass. When the seaming was ready, we extracted the protective tapes along the pane edges and the protective film on the panes. The seaming of each pane turned out to be very neat.

Blogi_2023-16-13.jpg

Photo by Lauri Veijalainen

There are also small sliding windows in the cockpit that can be opened. For them we received original framed panes from Airveteran Oy. Installing them proved to be a bit problematic. Both the sliding window frames lacked a locking screw from the bottom, with which the window was pressed with its rubber seal tightly against the frame to make it watertight. On top of that, both the frames of the sliding windows we received were both for the right-hand side. Luckily the right- and left-hand side pane differ from each other little enough, so we pushed the right-hand side pane deep and tightly enough into the grooves of the left-hand side frame. There it can remain for the time being, until we’ll find a suitable pane for it.

Blogi_2023-16-14.jpg

Blogi_2023-16-15.jpg

We noticed that along the windscreen and cockpit side window frames there were empty screw holes. What for, we wondered? To stop water from leaking into the fuselage, we blocked the holes by screwing groove-headed sheet metal aluminium screws into each of them.

Blogi_2023-16-16.jpg

Blogi_2023-16-17.jpg

Photos by Lauri Veijalainen

Blogi_2023-16-18.jpg

Photo by Janne Salonen

With the windows we had accomplished all the agreed tasks to refurbish the DO-5, so for our part the fuselage was ready to be transported to Turku Airport and to be on show there at the Airshow on June 17th -18th. The DO-5 fuselage left for Turku on Thursday June 15th.

Photos by Lassi Karivalo except if otherwise mentioned.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, Tuesday Club, C-47, DC-3, DO-5

Turku Airshow - Caravelle flight to Las Palmas

Maanantai 19.6.2023 - Erja Reinikainen

During the weekend, June 17th and 18th, Turku airport was the venue for the Turku Airshow 2023, which was the main airshow of the year in Finland. Early this year this date was written in large numbers on the coffee room wall in the hall in Pansio, where the Caravelle was under restoration. The aim was to present the Caravelle to the public, outside and inside, and tell its story until this day.

Cblogi_2023-70-01_JT.jpg

The Caravelle was outside the actual display area and because of this only those who came to the airshow by bus from Turku could visit the aircraft. On the other hand, the location by the pedestrian route allowed quick and easy access to the aircraft.

Cblogi_2023-70-02_JT.jpg

Cblogi_2023-70-02a_JT.jpg

Cblogi_2023-70-02b_JT.jpg

There were more visitors than we expected. On Saturday there were 865 and on Sunday 430 visitors, in total 1 295. At times the passenger stairs were crowded but some queuing didn’t seem to bother the good-humoured visitors. They told the Caravelle guides many stories about the aircraft. Sometimes it even seemed that the roles were interchanged. The visitor number 1000 was rewarded with a Caravelle key fob. Danial was the lucky winner who was congratulated by Jari Myrsky and received the key fob.

Cblogi_2023-70-03-04_IM.jpg

Photos by Ismo Matinlauri

Another visitor must be mentioned. The WWII fighter veteran and Caravelle pilot Mauri Maunula stopped by to have a look at the replica of his previous aircraft. During his brief chat with the Aviation Museum Society Finland’s chairman Janne Salonen several colourful incidents from Mr Maunula’s Caravelle times were told.

Cblogi_2023-70-03-05_JT.jpg

There was a small but busy Aviation Museum Society Finland sales stall by the Caravelle. Caravelle caps, T-shirts and mugs were sold there. On the second day of the airshow old aviation magazines were handed out for free to those coming to see the Caravelle. The magazines were popular especially among the younger visitors.

Photos by Jouko Tarponen except if otherwise mentioned.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Busy day at Turku Airport

Torstai 8.6.2023 - Erja Reinikainen

Suomeksi

On Wednesday, June 7th, there were about a dozen volunteers at work to prepare “the Bluebird” for public display. The work started at about 10 am and was continued until 6 pm. Now the weather was nicer than last week, the sun was shining, and it was almost warm.

Blogi_2023-65-01_IM.jpg

Photo by Ismo Matinlauri

Blogi_2023-65-02_JT.jpg

Blogi_2023-65-03_JT.jpg

Photos by Jouko Tarponen

The aim is to take down the scaffolding before the end of this week, so the work in the tail has been prioritized. The stencil stickers for painting the “AERO” text on the fuselage below the horizontal stabilizer were fastened into place and the text was painted in blue. In the tail fin there are several fillets and panels and the last of them were fastened into place. When the others were leaving, two men remained on the scaffolding finishing the panel sealings.

Blogi_2023-65-04_JT.jpg

Blogi_2023-65-05_JT.jpg

Photos by Jouko Tarponen

Blogi_2023-65-06_ER.jpg

Photo by Erja Reinikainen

There was activity on ground level as well. The right-hand side main landing gear was being cleaned. The result was surprisingly good although there was no water available. Under the aircraft the panels under the wing to fuselage joint were installed into place. Polishing was under way, too, on the wings and in the nose section. Furthermore, the blue paint on the window line had been slightly damaged by the crane slings when the fuselage was lifted. The damaged areas were sanded and re-painted.

Blogi_2023-65-07_ER.jpg

Photo by Erja Reinikainen

Blogi_2023-65-08_JT.jpg

Photo by Jouko Tarponen

Blogi_2023-65-09_ER.jpg

Photo by Erja Reinikainen

The cleaning of the cabin, started the day before, was continued. Now the cabin, flight deck, toilets, and aft upper cargo department have been vacuumed and cleared. The wall panels and overhead shelves have also been wiped with a damp cloth. This was a quick tidying of the appearance so that the inside of the aircraft can be presented to the public on the Turku airshow days. The restoration of the interior will be a project for the future.

Blogi_2023-65-10_CO.jpg

Photo by Curt Oksa

There were several visitors during the day. Maybe the Caravelle article on Helsingin Sanomat website today and the beautiful weather encouraged people to come and see “the Bluebird”. There were also visitors from Turku customs office, four officials and a dog. No traces of old smuggled goods were detected.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

The "Bluebird" assembly team

Lauantai 3.6.2023 - Erja Reinikainen

Suomeksi

The blogs written this week mention several times the Caravelle assembly team. So it is more than appropriate to introduce this group which was working on the Caravelle at Turku airport on two occasions in the past weeks. The first work phase took place on May 22nd-23rd, when the wings were transported from Pansio and joined at the airport. The second work phase was longer, May 29th-June 2nd, when first the fuselage was assembled on the wing and then the horizontal stabilizer and the vertical stabilizer were assembled on the tail. When written like this the task may sound simple, but it was far from that.

During the winter the Caravelle technical team, consisting of Markku Ahokoski, Kari Nyman, Martti Saarinen and Ismo Matinlauri, was coordinating the Caravelle restoration work which was going on in Pansio. Last year Markku, Kari and Martti planned how the Caravelle can be disassembled and now they planned and scheduled how it can be put back together.

Lifting the parts of the aircraft from a trailer and getting them accurately into place in the strong wind was a challenging task. Fastening the fuselage-wing joint bolts in the cramped keel tunnel wasn’t easy as it was almost dark there. Getting the vertical stabilizer and rudder into place on the scaffolding, in the torrents of rain, was quite an achievement, too. Assembling all the wing root fairings required a lot of patience from the team, as there were dozens of panels and hundreds of rivets. In addition to the demanding assembly work there were plenty of other activities during the week: jacks, plywood boards, pallets and car tires were moved where needed, items were taken out from the sea container and put back, slings and cargo straps were used for multiple purposes, there were several visits to the hardware store, etc.

The assembly team was led by Markku Ahokoski and in addition to Kari Nyman and Martti Saarinen, there were Reima Lindroth, Hannu Penttilä and Jouko Rinne, who had also been in Arlanda during the disassembly. Martti Saarinen wasn’t in Turku, but he participated in discussions on the phone during the assembly week. Yrjö Honkavaara and Elias Viitanen from the Pansio group were assisting in the assembly work and Erja Reinikainen worked as an overall helper.

This team of eight volunteers assembled the Caravelle “Bluebird” in five days, not including the days when the parts were lifted on trailers. Now the Pansio team can continue and assemble the remaining fairings and panels and go on with the sanding, painting, and polishing work.

Cblogi_2023-57-09_JT.jpg

Photo by Jouko Tarponen on May 29th, 2023.

This photo of the assembly team was taken in the Pansio hall on May 29th when the Caravelle fuselage had been lifted on the Ahola Special Transport trailer and the Society’s banner had been straightened. From the left: Hannu Penttilä, Yrjö Honkavaara, Reima Lindroth, Markku Ahokoski, Ismo Matinlauri, Elias Viitanen, Erja Reinikainen and Jouko Rinne, on far right ”Curre” who came to see what is going on in the hall.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Making the lower part of C-47 (DO-5) nose cone

Lauantai 3.6.2023 - Tuesday Club member

Suomeksi

In an earlier blog I told that we were lent the lower half of a DC-3 (OH-VKC) nose cone to make the missing lower half of the DO-5 nose cone out of fibre glass. The DO-5 operated at its time in the Finnish Air Force as a jump aircraft for paratroopers. Aviation Museum Society managed to buy the DO-5, which was heading for scrap yard. Unfortunately the middle section of the wing is missing.

Blogi_2023-15-01.jpg

We needed the lower part of the nose cone on loan to make an outer surface fibreglass mould. With the help of the mould we’ll make the missing lower half out of fibreglass. Why do we make the lower half out of fibreglass and not of sheet aluminium? Simply because making the lower half out of aluminium is much more challenging and, on the other hand, because the fibreglass lower half of the nose cone fills its place well in the nose of the non-flying DO-5.

Blogi_2023-15-02.jpg

Blogi_2023-15-03.jpg

The lower half of the OH-VKC nose cone we loaned, and the DO-5 nose cone upper half are of the same DC-3 family, but they have been manufactured in different times and places. Because of this we still wanted to test, whether the OH-VKC lower half and the DO-5 upper half are a match. They weren’t an exact match, but close enough for us to use the loaned lower half of the nose cone to make a fibreglass mould.

Blogi_2023-15-04.jpg

Blogi_2023-15-05.jpg

The first phase in making the fibreglass mould was to stiffen the lower part of the OH-VKC nose cone so that it wouldn’t distort when under work. This was because the lower half, made of thin aluminium sheet, detached from the nose of the OH-VKC is “sloppy” and won’t retain its form. A wooden cross stiffener was made between the opposite corners of the lower half. Then curved stiffeners in the form of the lower half edges were sawn out of 20 mm thick film plywood, which were attached to the edges of the lower half of the nose cone. The stiffeners were fastened by utilizing the existing attachment screw holes in the edges. Now the nose cone lower part will stay in form when handled.

Blogi_2023-15-06_RS.jpg

Blogi_2023-15-07_RS.jpg

Blogi_2023-15-08_RS.jpg

Photos by Reijo Siirtola

Before making the fibreglass mould the bottom surface of the nose cone had to be cleaned into aluminium from the paint and filler covering it. The mottled history of the OH-VKC could be seen in the many layers of paint on the nose cone. An attempt to remove the layers of paint using a grinder failed because the sanding discs got choked instantly. Next a paint removing agent and scraping the paint off was tried. Suitable for our purposes proved to be Solmaster MP EKO Maalinpoisto (paint remover). Plenty of Solmaster was applied onto a restricted area of the aluminium surface and the area was covered with fabric to prevent evaporation. When the substance had worked a while, the paint could be scraped off with a wooden spatula. The wooden spatula worked well, and it doesn’t damage the aluminium surface of the lower half. Because the surface remained sticky, the final cleaning was done with thinner and xylene. In this way, phase by phase, the nose cone lower half’s surface was cleaned. Finally the surface was buffed with a nylon slip disc (Mirka nylon 60x30x6m).

Blogi_2023-15-09_RS.jpg

Photo by Reijo Siirtola

Before layers of fibreglass fabrics, impregnated in polyester resin, could be applied on the surface of the lower half of the nose cone, the surface had to be carefully sealed. The sealing is important, because the sealer prevents the resin impregnated fibreglass mat from sticking on the aluminium surface below. Five layers of Miracle Gloss 8 sealer by Kevra Oy were rubbed on the lower half’s surface. Three first layers were rubbed on the cone surface with an interval of an hour, then a 12 hour pause, and finally the last two layers again with an interval of an hour.

After 24 hours the lamination could be started. As lamination mat Biltema woven fibreglass fabric 30-512 was used, and as resin Biltema Polyester resin 36-0780”. The Polyester resin was chosen because its price was a shy quarter of the corresponding epoxy resin, and it won’t stick easily on the sealed surface of the mould.

Blogi_2023-15-10_RS.jpg

Photo by Reijo Siirtola.

Before the real lamination with fibreglass fabric, a test lamination with a small piece of fibreglass fabric was made. A piece of fibreglass fabric was impregnated with polyester resin while the piece of fabric was spread on cardboard. When the white colour of the fabric changed into transparent, it was turned over and polyester resin was applied on the other side, too. The cardboard from a cardboard box is an excellent base for this purpose. It’s strong enough to withstand the fibreglass mat to be impregnated with polyester resin and the resin won’t absorb into the cardboard to any significant degree. The piece of fibreglass fabric, impregnated with polyester resin, was “squeezed” tightly with a roller onto the surface of the lower half of the nose cone. The fabric stuck on well, and what was most important, after drying the fabric came off the next day without damage. So the sealing was a success.

Blogi_2023-15-11_RS.jpg

Photo by Reijo Siirtola

Now we could start to laminate the whole of the surface of the lower half with fibreglass fabric. For that purpose three pieces covering the lower half surface were cut out of the fibreglass fabric. First the surface of the lower half of the nose cone was completely covered with polyester resin. After that the first piece of lamination fabric was impregnated with resin and it was laminated on the surface of the lower half of the nose cone. Three layers of fabric were laminated. Finally on top of the layers thick ropes were laminated with polyester resin, which after drying would form a supporting structure keeping the mould in form.

Blogi_2023-15-12_RS.jpg

Blogi_2023-15-13_RS.jpg

Blogi_2023-15-14_RS.jpg

Photos by Reijo Siirtola

The next day the fibreglass mould could be detached. The detaching succeeded with ease, and no traces were left on the aluminium surface – thanks to the excellent sealer. Extra bits out of the edges of the mould were cut off. Slight unevenness was noticed on the inner surface of the detached mould. The uneven patches were sanded, and the surface was spackled with Biltema’s fibreglass filler (36-0137) and buffed. Thus the fibreglass mould had been finished for the lamination of the lower half of the nose cone.

Blogi_2023-15-15_RS.jpg

Photo by Reijo Siirtola

The lamination of the lower half of the nose cone began with the sealing of the inner surface of the fibreglass mould. After sealing the lamination was started, but this time with fibreglass mat. The reason for this was that with using of fibreglass fabric some unevenness seemed to remain, which necessitated extra buffing. With the fibreglass mat, which was pressed out of short glass fibres, the fibres criss-cross with each other. That gives a very smooth surface when laminated with a roller. Due to the structure of the mat it has also a good tensile strength in every direction.

Blogi_2023-15-16_RS.jpg

Photo by Reijo Siirtola

A piece covering the inner surface of the mould was cut. Polyester resin was first applied to the surface of the sealed fibreglass mould. After that the polyester resin impregnated pieces of fibreglass mats were laminated with a roll, one after the other, onto the inner surface of the mould. After the fibreglass had dried out the laminate was detached from the inner surface of the mould. It could be seen that the surface of the lower half of the fibreglass cone was remarkably smooth, nearly ready for painting.

Blogi_2023-15-17_RS.jpg

Blogi_2023-15-18_RS.jpg

Photos by Reijo Siirtola

Because the fibreglass lower half of the nose cone wouldn’t hold its form without support, new supports cut out of thick plywood were installed. Thus it was secured that that the new fibreglass lower half of the nose cone stays in form when fitted on to the nose of the DO-5. The surface of the fibreglass lower half was spackled and sanded and primed with grey primer. When the lower half of the OH-VKC nose cone and the fibreglass lower half were put side by side, they looked identical, as was planned.

Blogi_2023-15-19_JV.jpg

Photo by Juha Veijalainen

Blogi_2023-15-20.jpg

The new lower half of the nose cone was ready to be fitted onto the nose of the DO-5. During the fitting it will be seen how much we’ll have to work on its edges, so that we’ll be able to get it settle the way we want, against the upper half of the nose cone. To fit the lower half of the nose cone onto the DO-5 nose, we removed a sheet metal covering plate, which had protected the “cut off” nose. Behind it all sorts of rubbish, accumulated in the nose during the decades, was revealed and had to be cleaned off.

Blogi_2023-15-21.jpg

Blogi_2023-15-22.jpg

Blogi_2023-15-24.jpg

After cleaning we installed the upper half of the DO-5 nose cone in place and started fitting the fibreglass lower half in place. When fitting the lower half we noticed that the lower half was just within the tolerances, as we had hoped it would be. Naturally the edges of the lower half and the plywood supports inside had to be modified a few times so that the lower half of the nose cone was settled in the way we hoped, against the fuselage and the upper half.

Blogi_2023-15-25.jpg

The fibreglass lower half of the nose cone was ready waiting for the finishing coat of paint. At this stage it was painted grey and is allowed to stand out from the original upper half of the cone. If the DO-5 aluminium fuselage is to be polished at some stage, the fibreglass lower half of the nose cone will be painted with a paint that will emulate the aluminium surface.

Photos by Lassi Karivalo except if otherwise mentioned.

Translation by Matti Liuskallio.

Avainsanat: aviation history, restoration, Tuesday Club, C-47, DC-3, DO-5

The "Bluebird" has been assembled

Perjantai 2.6.2023 - Erja Reinikainen

Suomeksi

On Friday, June 2nd, the Caravelle assembly team and the assistants who came to help from Pansio were facing the dreariest conditions of the week at the Turku airport: it was +6°C in the morning, there was a strong wind from the north and there were heavy showers of rain during the day.

Cblogi_2023-62-08_JP.jpg

Photo ny Janne Pauni

Cblogi_2023-62-09_ER.jpg

Photo by Erja Reinikainen

In the morning the scaffolding builders extended the scaffolding around the tail. The rudder was unloaded from the sea container and pieces of metal net were fastened on the holes in the leading edge of the rudder to prevent birds from getting inside the rudder. A new cable was installed for the anti-collision light – it will wait for the new electrical system to be installed later. The rudder and the elevators were locked into a fixed position by preventing the movement of their servos.

Cblogi_2023-62-10_ER.jpg

Cblogi_2023-62-11_ER.jpg

Cblogi_2023-62-12_ER.jpg

Photos by Erja Reinikainen

The assembly team prepared to assemble the vertical stabilizer and the rudder in the usual way: the tools and accessories, bolts, safety harnesses, cargo straps, etc. were arranged for use. First the vertical stabilizer was lifted from the ground, a rather challenging operation in the strong wind. High on the scaffolding around the tail the tall stabilizer was inched into place although a shower of rain disturbed the assembly team. The main bolts could be installed quite easily. The rudder is a difficult item to lift, tall and narrow, and it had to be fitted accurately into place in the strong wind. The cargo straps held by the assistants prevented the rudder from swinging during the lifting and assembly. This time it took more effort to install the fasteners – and another heavy shower disturbed the team on the scaffolding. By lunchtime the rudder was in place and the Finnish flag was up on the Caravelle’s tail – a fine sight. It was time to call the aircraft by its Finnish name, “Sinilintu”, i.e. “Bluebird”.  

Cblogi_2023-62-13_ER.jpg

Photo by Erja Reinikainen

Cblogi_2023-62-14_JS.jpg

Photo by Janne Salonen

Cblogi_2023-62-15_ER.jpg

Photo by Erja Reinikainen

The Friday afternoon was spent on miscellaneous tasks. The installation of the stabilizers was finalized on the scaffolding, the floor in the cabin was temporarily fixed with plywood boards, the car tires, and pieces of cardboard on which the stabilizer and rudder had been on the ground were collected, the cargo straps were picked up, the contents of the containers was arranged, etc. The repaired and painted radome was installed on the Caravelle’s nose, and this changed its appearance remarkably.

Cblogi_2023-62-16_JS.jpg

Photo by Janne Salonen

During the day an electric cable was pulled from the Finavia area to the right-hand side of the nose wheel. Hopefully the installation will be ready next week, and power will be available on the site. This would make it possible to start sanding, polishing and installation work.

Cblogi_2023-62-17_JT.jpg

Photo by Jouko Tarponen

The assembly team (Markku, Kari, Hannu, Jouko, Reima and Erja) were relieved, they had completed this phase in the Caravelle’s restoration successfully and in the planned schedule. Now the Turku (former Pansio) team can continue and finalize the outside of the aircraft and prepare the cabin for display during the following weeks before the Turku Airshow. The daily reporting of the assembly work ends to this blog.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Assembly of the horizontal stabilizer and farewell to the hall in Pansio

Torstai 1.6.2023 - Erja Reinikainen

Suomeksi

On Thursday, June 1st, the Caravelle’s horizontal stabilizer and vertical stabilizer were lifted on the Ahola Special Transport trailer, and these were the last items to be transported as special transport. This load was not tall and not very wide either, so it could be taken to the airport during the day. The last items were packed into the sea container and the Pansio hall was ready to be vacated.

Cblogi_2023-62-01_JT.jpg

Cblogi_2023-62-02_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-62-03_JS.jpg

Photo by Janne Salonen

At the airport the assembly work was continued in windy weather. In the morning preparations were made for assembling the horizontal stabilizer and the assembly team checked that all needed special bolts, tools, safety harnesses, etc. were at hand. The “hiab” loader crane arrived soon after noon. When everything was ready for the lift, the wind got stronger, there was a brief hailstorm and sand dust was flying in the air.

Cblogi_2023-62-04_JT.jpg

Photo by Jouko Tarponen

First the vertical stabilizer was lifted from the trailer and lowered to the ground on car tires to wait for assembly on the following day. The rudder was brought to the airport from Pansio in the afternoon, in the sea container which had been loaded there in the morning.

Cblogi_2023-62-05_ER.jpg

Photo by Erja Reinikainen

The Caravelle’s horizontal stabilizer is large and lifting it in the gusty wind on the fin root on top of the fuselage was quite an achievement. Fortunately the wind was blowing against the nose of the aircraft and towards the tail, so the stabilizer didn’t swing too much from side to side during the lift and assembly. Cargo straps had been fastened to the tips of the stabilizer and the assembly team members holding the straps were prepared to prevent the swinging. Once again there were professionals at work – assembling the stabilizer on the scaffolding and operating the crane – and the stabilizer was soon in place without too much effort. The main bolts could be fastened without major difficulties and the assembly team could sigh with relief. Then it was time for a coffee: the aggregate was started, coffee was brewed, and the team sat beside the sea container, in shelter from the wind.

Cblogi_2023-62-06_JT.jpg

Cblogi_2023-62-07_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-62-08_JP.jpg

Photo by Janne Pauni

There were other activities during the day too: more wing to fuselage fillets were assembled and fastened using rivets and screws. The pop rivet guns were causing some trouble again, the battery driven one didn’t function well and the manual one broke the day before. The large rivets are so thick that the tools are strained to the limit. There was also activity in the cabin, after a long silence, when the wall upholstery was tidied, and the toilets were fixed. The plywood floorboards will have to be repaired before the public can be allowed to come and see the cockpit and cabin.

Avainsanat: aviation history, restoration, Caravelle, OH-LEA, Sinilintu, Bluebird

Work on the nosewheel and wing fillets

Keskiviikko 31.5.2023 - Erja Reinikainen

Suomeksi

On Wednesday, May 31st, the Caravelle assembly team worked at Turku airport in windy weather, concentrating on smaller and less impressive, but nevertheless important details.

Cblogi_2023-61-01_ER.jpg

Cblogi_2023-61-02_ER.jpg

Photos by Erja Reinikainen

The assembly of the wing to fuselage fillets was continued. In the wing root there are several fillets, of different shapes and sizes, fastened with rivets and screws. The assembly team spent all day fitting these fillets into place, on top of the wing and below it. Fasteners, which had been drilled out in Arlanda had to be removed, holes were opened, and countersunk edges drilled. New fasteners were installed, screws with cup washers and pop rivets. Probably hundreds of pop rivets were used during the day. Unfortunately the bottleneck in the assembly work was that there was only one battery-driven pop rivet gun in use.

Cblogi_2023-61-03_ER.jpg

Photo by Erja Reinikainen

The nose landing gear has been retracted since Arlanda as the fuselage has been on supporters on the floor. Now an external hydraulic pump was connected to the actuating cylinder of the nose landing gear and using the emergency manual unlock mechanism the landing gear was extended. The nose was lifted a little with the jacks under the front fuselage and now the aircraft looks as if it is positioned on the nose wheels, although its weight is still on the jacks. In the future a support will be made for the nose landing gear to take the weight off the wheels.

Cblogi_2023-61-04_ER.jpg

Photo by Erja Reinikainen

During the day scaffolding was built around the tail for the assembly of the stabilizers. On Thursday, June 1st, the horizontal and vertical stabilizers will be transported from Pansio to the airport. The aim is to lift the horizontal stabilizer from the trailer on the Caravelle’s tail. It remains to be seen whether this is possible or not if the wind is as strong as it was today.

Cblogi_2023-61-05_JT.jpg

Cblogi_2023-61-06_JT.jpg

Cblogi_2023-61-07_JT.jpg

Photos by Jouko Tarponen

While the riveting of the wing fillets was going on at the airport, the Pansio hall was cleared. The hall contract ends on June 1st and all the parts, tools and accessories which are still there will be brought to the airport in a sea container. In the coming weeks the Pansio team will go on with the remaining painting and polishing work at the airport.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking;OH-LEA, Sinilintu, Bluebird

The fuselage is installed on the wing

Tiistai 30.5.2023 - Erja Reinikainen

Suomeksi

The Caravelle’s fuselage was transported from Pansio to Turku airport during the night, May 29th-30th. The load on the trailer was so tall that the Ahola truck had to do quite a detour to get to the airport. On Tuesday morning the Caravelle trailer was waiting for the assembly team to arrive.

Cblogi_2023-58-01_JT.jpg

Cblogi_2023-58-02_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-58-03_JS.jpg

Photo by Janne Salonen

In the morning there was a mobile crane with two hooks and a “hiab” loader crane, on which the free-turning cable pulley system was fastened. This made it possible to lift the fuselage and to turn it around all its axes. First the fuselage was lifted from the trailer and supported by the cranes. The assembly team placed groups of three jacks on plywood boards under the fuselage, one group in front and another in the rear. Then the fuselage was lowered slowly into its position on the wing.

Cblogi_2023-58-04_ER.jpg

Cblogi_2023-58-05_ER.jpg

Photos by Erja Reinikainen

The fuselage was carefully manoeuvred downwards, inch by inch, guiding it to meet the assembly points on the wing and the front and rear edges of the wing joint. The final inches required accuracy from the crane operators when the fuselage had to be turned towards the road or towards the forest, the nose or the tail had to be lowered or the whole fuselage rolled slightly. Fortunately there were calm professionals on the crane controls as well as in the assembly team and eventually the fuselage settled into place. This phase took about one hour.

Cblogi_2023-58-06_ER.jpg

Cblogi_2023-58-07_ER.jpg

Photos by Erja Reinikainen

Getting the bolts connecting the wing and the fuselage into place took more time. The fuselage was still supported by the crane slings when the position of the fuselage was manoeuvred so that the bolts could be fastened. The first fasteners were easy to get into place but the attachment bolts in the fuselage keel tunnel area and especially the front lower fittings were the most difficult to install. To get the bolts into place the position of the aircraft was inched by using the tripod jacks, changing the position of the wings, and trying to get weight into the tail. A couple of times all members of the assembly team climbed into the tail section as weight load. By lunchtime all bolts had been installed.

Cblogi_2023-58-08_ER.jpg

Cblogi_2023-58-09_ER.jpg

Photos by Erja Reinikainen

In the afternoon a large tripod jack was brought under the tail to support it, assembly work in the keel tunnel was continued, and the assembly of the wing leading edges and the wing to fuselage fillets was started. During the disassembly in Arlanda the leading edge, flaps and wing root fillets of the left-hand wing had been removed – and now they will be installed back into place. A lot of fasteners will be needed, and there will be demand for the fasteners which were cleaned in the ultrasonic washer in Pansio. A leak was observed in the hydraulic system of the integral stairway, now it was repaired, and the stairway is operating again.

Cblogi_2023-58-10_ER.jpg

Photo by Erja Reinikainen

Members of the Pansio team and of the airport staff came to see the Caravelle and to take pictures. There were also curious visitors who had read about the aircraft in the local paper, Turun Sanomat. There will be more to see on Thursday when the vertical stabilizer is lifted into place.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking;OH-LEA, Sinilintu, Bluebird

Last-minute rush in Pansio

Maanantai 29.5.2023 klo 22.00 - Erja Reinikainen

Suomeksi

The transportation of the Caravelle’s fuselage is approaching and the Pansio team members have been busy all weekend, completing the last tasks on the fuselage. The fuselage will be lifted on a trailer on Monday evening, May 29th, and transported to the airport during the night.

Cblogi_2023-41-03_ER.jpg

Photo by Erja Reinikainen

The last tasks included the stencil stickers, which were fastened on the fuselage for painting the texts and logos according to the Finnair paint scheme. The stencils came from the print cut into individual text sheets and the largest Finnair texts divided into several parts. The letters and logos which will be painted were picked away from the sheets – i.e. there are holes in the areas which are painted. When this had been done, an adhesive foil was placed on the stickers to hold the letters in shape when the stickers are fastened on the aircraft. The stickers used as stencils are placed carefully on the fuselage and the texts, logos and registration are painted with a roller, following the holes in the stencils. When the paint has dried, the stencils are removed.

Cblogi_2023-54-02.jpg

Cblogi_2023-54-03.jpg

Cblogi_2023-54-04.jpg

Photos by Ismo Matinlauri

The stencil stickers for painting Finnair and OH-LEA, which are the largest and most difficult stickers to handle, were fastened on both sides of the fuselage on Friday, May 26th. The stencils stayed well in place when the adhesive foil was removed, and the texts have been painted. Some of the stencils have already been removed, some of the texts are still drying.

Cblogi_2023-54-05_JT.jpg

Photo by Jouko Tarponen

During the weekend the blue stripe on the window line was painted once more. The blue paint is drying and the preparations for transporting the fuselage are on the way.  

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu, Bluebird

Caravelle towbar restored

Lauantai 27.5.2023 - Tuesday Club member

Suomeksi

The original towbar for Caravelle III (SE-DAF), acquired from Sweden by Aviation Museum Society, was brought along. It was used by SAS. The towbar was abandoned by SAS along with the termination of the Caravelle fleet’s career. The towbar had lain decades at Arlanda Airport along SE-DAF.

Blogi_2023-14-17.jpg

The towbar was taken under restoration at the Tuesday Club in the autumn of 2022, in a similar fashion as the derelict Super Caravelle towbar was restored, used by Finnair. The SAS towbar is of the first version made by the Sud Aviation industries. For its part the Super Caravelle towbar used by Finnair is of the third and last version. The differences between these towbars are minimal and concern mainly the wheel rack of the towbar.

Blogi_2023-14-01.jpg

Blogi_2023-14-02.jpg

Along with the spring all the parts of the towbar were refurbished and painted. The last job before assembling the towbar was to repair the wheel rack to working order. When the towbar wheel rack was dismantled in the autumn season, it was noticed that the rim of the other wheel was so far gone that it was unusable. The other wheel’s rim was sound enough to be usable with a bit of welding. A new tyre and inner tube were bought for it and one of the bearings, which had broken when the wheel was dislocated from the axle of the wheel rack. When the rim had received its blue colour, the inner tube and the tyre were fitted in place.

Blogi_2023-14-03.jpg

To replace the unusable wheel, we managed, after a spot of searching, to find a wheel with an inner tube looking like the original wheel, and fitting the towbar’s 25 mm axle. A majority of the “wheelbarrow” wheels on sale were made for a 20 mm axle. When the rim of the new wheel had also been painted blue you could hardly tell them apart. The wheels were attached on to the wheel rack’s axles, after which the test assembling of the towbar could be commenced.

Blogi_2023-14-04.jpg

The test assembling will be necessary, because the towbar will be transported in parts to the Turku Airport area, where it will be assembled on show next to the ex SAS Caravelle SE-DAF, now being restored as the Finnair “Bluebird”. By test assembling it will be ensured that the assembling in Turku will take place without surprises.

Blogi_2023-14-06.jpg

The towbar test assembly was started by setting against each other the flanges of the halves of the towbar. We had to do some thinking, because the guiding pins for the flanges of the towbar halves didn’t line up with their holes so that the lifting handles are in the same line. We established that the towbar halves must have been 180 degrees out of line of each other already when they came to Finland.

Blogi_2023-14-08.jpg

This we hadn’t noticed when dismantling the towbar, because the towbar lacked the lifting handles, which would have indicated the position. If they had been there, we would have noticed that one handle was beneath the towbar, the other one above. So our conclusion is that the towbar was wrongly assembled at Arlanda. An indication of this is that in the photos we took before the dismantling of the towbar, the metal support of the towbar which should touch the ground is sticking to the skies.

Blogi_2023-14-10.jpg

To solve the problem of test assembling we sawed off the guiding pins and pressed the flanges of both the bar halves against each other so that the lifting handles were above the towbar and lined up properly with each other. After this the flanges were locked to each other with two locking collars around them. The collars were tightened fast by their brackets with bolts. This way the towbar halves had been connected.

Blogi_2023-14-11.jpg

Blogi_2023-14-12.jpg

Now it was time to attach the wheel rack to the towbar. The wheel rack was attached to the towbar by its attachment collars. The rack wasn’t attached in the middle of the towbar, but some way on the pull loop end side of the centre of gravity. Thus the aircraft towhead end, which connects with the nose gear, weighs down and leans on the ground by its support. Finally we attached the manufacturer’s plaque on the side of the towbar. The towbar is still lacking the Caravelle logo, which will be painted on its side before it will be ready to be delivered to Turku.

Blogi_2023-14-14.jpg

Blogi_2023-14-16.jpg

Blogi_2023-14-18.jpg

The derelict towbar underwent a complete transformation at the hands of the Tuesday Club. It changed from the rusty and partly damaged towbar into a renewed one, resembling the towbars used by the Finnair Caravelle fleet. It received the same appearance as the Finnair Super Caravelle towbar we restored a year ago.

Photos by Lassi Karivalo

Translation by Matti Liuskallio

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking;OH-LEA, Sinilintu, Bluebird;Tuesday Club

Caravelle's fuselage is painted

Torstai 25.5.2023 - Erja Reinikainen

Suomeksi

While the assembly team was working at the airport with the wing junction, the upper part of the Caravelle’s fuselage was being painted white in the port hall in Pansio. The spray-painting was done by a contractor (Maalausliike T. Nikander). A layer of white paint was sprayed on the fuselage surface on two consecutive days, so two layers. Finally a protective layer of lacquer was sprayed on the painted surface.

Cblogi_2023-53-01_JT.jpg

Cblogi_2023-53-02_JT.jpg

The Pansio team found spray-painting to be a challenging task for amateurs and decided to hire a professional to do the work. The project schedule doesn’t allow any practise rounds at this point. The spray-painted area looks good, thanks to the professional.

Cblogi_2023-53-03_IM.jpg

Photo by Ismo Matinlauri.

Actually we ran short of time with the painting work because the spring was very cold, the temperature in the unheated hall remained low for so long that the painting couldn’t be started in the planned schedule.

Cblogi_2023-53-04_IM.jpg

Photo by Ismo Matinlauri

Cblogi_2023-53-05_JT.jpg

When the paint and lacquer on the fuselage have dried, the protecting plastic can be removed from the window line and the stencil stickers can be fastened on the fuselage for painting the airline and aircraft type texts.

Photos by Jouko Tarponen except if otherwise mentioned.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu, Bluebird

Caravelle's wings are transported and assembled

Tiistai 23.5.2023 - Erja Reinikainen

Suomeksi

At the end of May the lease of the port hall in Pansio will terminate, and during the winter all Caravelle’s restoration, painting and assembly work has been scheduled to keep this deadline. The assembly phase started on Monday, May 22nd, when the assembly team (6 people) and an experienced aircraft polisher came to help the hard-working painters and polishers in Pansio.

Cblogi_2023-51-01_ER.jpg

Cblogi_2023-51-02_ER.jpg

Photos by Erja Reinikainen

A lot happened in the hall in just half a day, when preparations were made for the transportation, painting, and assembly, which were at hand. The list of completed work is long: The lower part of the aircraft’s fuselage on the left side was polished, mainly below the wing area. A large area of shiny polished surface was completed. The ready painted and polished surfaces of the fuselage were covered with thin plastic to protect them from the spray painting of the upper fuselage, which will begin on the following day. The remaining fasteners of the wing junction were cleaned. The stabilizers, which have been painted and polished, were covered with tarpaulins. Aviation Museum Society Finland banner was fastened on one wing for the transportation as a commercial. The sea container, which has been used as a storage in the hall, was emptied. All essential aircraft parts, tools, fasteners, assembly accessories, etc. which are needed in the assembly work, were loaded into another sea container, parked outside the hall. Only the tools, paint, and stencil stickers, which are needed in the painting and polishing work during the next ten days were left in Pansio.

Cblogi_2023-51-03_ER.jpg

Photo by Erja Reinikainen  

The assembly team spent part of the afternoon on the aircraft’s future location at Turku airport, measuring and planning how to make sure the wings are in the correct position and can be joined.

Cblogi_2023-51-04_JS.jpg

Photo by Janne Salonen

In the afternoon the sea container was packed and ready to be taken to the Caravelle’s future location at the airport. Moving the container on the trailer was not an easy task, but eventually the chains were in the correct position and the container was on the trailer. The truck carried also a couple of passenger stairs and two large jacks.

Cblogi_2023-51-05_JT.jpg

Cblogi_2023-51-06_JT.jpg

Photos by Jouko Tarponen

Cblogi_2023-51-07_JP.jpg

Photo by Juha Paju

Cblogi_2023-51-08_JT.jpg

Photo by Jouko Tarponen

Loading the wings on the Ahola Special Transport trailers went well, the same procedure had been done in August 2022 when the aircraft was brought from Arlanda. The bridge cranes in the hall were used to lift up the wings, one at a time, then the trailer was reversed under the wing. When the position of the wing had been checked the wing was lowered on its supports on the trailer. The two trailers were taken to Turku airport before midnight.

Cblogi_2023-51-09_JS.jpg

Photo by Janne Salonen

In Pansio the hall was almost empty now and it is really strange that the hectic final push is almost over. The top part of the fuselage will be painted during this week and the stabilizers are waiting to be transported at the end of May.

Cblogi_2023-51-10_ER.jpg

Cblogi_2023-51-11_ER.jpg

Cblogi_2023-51-13_ER.jpg

Photos by Erja Reinikainen.

On Tuesday, May 23rd, the wing assembly work began at Turku airport. In the morning two mobile cranes were on site bright and early. Before the wings were moved, the aircraft’s future position was measured carefully and marked on the concrete slabs, which had been dug into the ground. The left wing was lifted from the trailer. Finding the correct position required some work and patience from the crane crew and the assembly team members who were measuring and operating the jack. Finally the wing was lowered on the ground, its weight resting on the support under the landing gear, on a wing jack and on two wing supports. The right wing was aligned into place, inch by inch, using the two cranes. The wing junction brackets met each other, and they were secured using the assembly pins which had been made to assist in the aligning. When some final adjustments had been made on the wing position, the wing junction expansion pins could be installed, and the wing lowered on its supports. By mid-day all expansion pins were in place and the assembly team could sigh with relief: everything had gone far better than expected.

Cblogi_2023-51-14_ER.jpg

Photo by Erja Reinikainen

The wing junction’s canted brace struts were installed into place, then all tools and assembly accessories were collected into the sea container and the aircraft was surrounded with warning tape. The assembly will be continued next week when the fuselage has been painted and it will be transported from Pansio and lifted on the wing.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu, Bluebird

The work in Pansio is taking the final sprint

Torstai 18.5.2023 - Erja Reinikainen

Suomeksi

During the last weeks of May the Caravelle team in Pansio is facing the final push when the finishing touch is put on the restored parts of the aircraft before they are transported to Turku airport. The transportation of the wings is planned to take place on May 22nd, the fuselage is transported during the night on May 29th-30th, and the stabilizers at the end of that week.

Cblogi_2023-42-01.jpg

The painting of the wings has been completed and the surfaces have been covered with a layer of lacquer which increases the lifetime of the painted surface and makes its maintenance easier. The registration markings (OH-LEA) will hopefully be painted on the upper surface of the wing before the wings leave the Pansio hall. The polishing work on one wing is lagging behind and only its flaps have been polished. This means that some polishing remains to be done at the airport. The wing junction expansion pins were cleaned this week and the work will be continued. The wing junction’s canted brace struts and their bolts are still waiting to be cleaned.

Cblogi_2023-42-02.jpg

When the wings are taken to the airport, they will have to be placed in the correct position, so that it will be possible to lower the fuselage on the wing. This manoeuvre was planned this week when the fuselage was lifted from its trestles and into a horizontal position, using a levelling instrument. Then the position of the wing-to-fuselage fittings were measured.

Cblogi_2023-42-03.jpg

The lower side of the fuselage has been sanded, excluding the lowest area. We aim to polish the tail section and the wing junction area before the fuselage is moved from the hall. Then about half of the fuselage polishing would be ready and the rest will be done at the airport.  

Cblogi_2023-42-04.jpg

The painting of the Finnair blue stripe on the window line has been started in the tail section. The painting line has been marked all the way along the side of the aircraft. This was easier said than done in the nose section, where the surface curves in two directions. The blue stripe and the narrow white line below will be completed this week. Then the only remaining painting task is to paint the upper fuselage white. When the wings have left the hall, a company specialized in spray painting will apply the two layers of white and the finishing lacquer.

Cblogi_2023-42-05.jpg

The engine nacelles were painted and covering plates were installed in the air intake and exhaust nozzle. The plate in the air intake looks very much like a real Avon engine with its spinner. The covering plate in the exhaust nozzle is grey with the logo of Aviation Museum Society Finland.

Cblogi_2023-42-06_IM.jpg

Photo by Ismo Matinlauri.

Work has been started also at the future Caravelle site at Turku airport. The three hollow-core slabs, donated to the project, have been dug into the ground under the landing gear positions. The second driveway has been built and the sheathing for the power cable has been installed into its trench. However, the power supply won’t be available when the assembly work will be started on the site.

Cblogi_2023-42-07_OH.jpg

Cblogi_2023-42-08_OH.jpg

Photos by Ossi Harjula

Next week the Caravelle work is picking up speed when the Pansio team is busy with the final painting work and the Vantaa team begins the assembly work at the airport. The work can be followed in these blogs, there will be several updates in the coming weeks.

Photos by Jouko Tarponen except if otherwise mentioned.

Avainsanat: aviation history, restoration, Caravelle, SE-DAF, Sven Viking, OH-LEA, Sinilintu

« Uudemmat kirjoituksetVanhemmat kirjoitukset »